ONE POUR Foundation Brackets are the quicker, better and stronger solution for a pole barn foundation or post frame foundation. ONE POUR Foundation Brackets are available as an in-house (press on) application for larger volume post suppliers and/or builders or as a field applied (nail on) bracket. Both brackets are manufactured with a G90 galvanized coating. Hot-dip galvanizing is available as an option. Please call for pricing.
ONE POUR Foundation Brackets only require a one day process and a single visit by the concrete truck, saving builders invaluable time. Drilling holes in posts for rebar is a time consuming practice of the past. Both Brackets provide far greater engineering uplift values then current building practices.
Many Builders currently drop pre-formed concrete pads (pill blocks/cookies) in the post hole to provide the foundation for the post. Pre-formed concrete pads are in many cases inadequate for Post Frame Buildings greater then 32' in width; unless soil compaction tests indicate otherwise. Wet poured foundations for Post Frame Buildings are another alternative and usually require a two day two-step process.
The first step on day one requires pouring the concrete footers. After the concrete hardens typically on the second day posts are fitted with rebar ( uplift restraint ) and positioned in place. The concrete truck arrives at the job site the second time to pour the collar ties. Builders know how costly delays can be due to things like rain and having to remove water and mud from post holes.